Client: Oswegoland Park District
Construction Cost: $60,000
Year Completed: 1999
Project Description: Field Surveys and design of 10' x 63' prefabricated bridge and approaches carrying the Fox River Trail over a Tributary to the Fox River. Work included setting the alignment, selecting the structure size and type and design of the structure foundations.