|
Client: IDOT District 6
Construction Cost: $21,000,000
Year Completed: 2006
Project Description: This project included the design of 4.5 miles of rural expressway west of Macomb. The work included field surveys, Right of Way surveys and plat preparation, roadway and drainage design. The project is stage constructed.
IE served as the prime consultant and provided Design Services for this project. |